Lake Bonney: Stage 3 Wind Farm
2365 Canunda Frontage Road, German Flat, SA 5280
The 39MW Lake Bonney Stage 3 wind farm achieved financial close in 2009. The project includes 13 Vestas V90 wind turbines and a 132kV connection into the ElectraNet Network.
​
This was the final stage of the Lake Bonney wind farm precinct and was developed by Babcock and Brown and National Power Partners before being sold to Babcock and Brown Wind (BBW). It was initially invested on a merchant revenue basis.
​
The Lake Bonney Stage 3 wind farm:
-
has capacity to power equivalent of 18,000 SA homes per year
-
benefits from the strong southerly winds that come over the Woakwine range
-
together with stages 1 and 2 the combined Lake Bonney project is 279 MW
Frank was involved in the development of this project and in the funding process.
LOCATION
Gernman Flat, South Australia
​
CAPACITY
39MW
​
OUR ROLE
Members of the Tetris team were involved in the development of this project
​
EPC
Vestas
​
OFFTAKE
Merchant
​
FINANCIAL CLOSE
2009
​
COMPLETION DATE
2010
​